Hydrogen Liquefaction

Trans Global Projects is delivering a global logistics program for a hydrogen liquefaction facility, moving heavy-lift and out-of-gauge equipment from multiple origins to Rotterdam for laydown and onward transport, ensuring seamless coordination across complex supply chains.

FACTS & FIGURES

Timeframe
2025–2026 (ongoing). Global transport and consolidation of equipment is underway.

Route
Shipments originated worldwide and are routed to Rotterdam, the Netherlands. Cargo is delivered to a marshalling yard for laydown before final transport to site.

Client
A leading global player in the hydrogen sector within the renewables industry.

Transport
Project logistics included heavy lift and out-of-gauge shipments via ocean freight.

The Cargo
Total volume: 89,000 cbm, including 77 heavy lift and OOG moves.
Largest item: CO₂ absorber (65.40 m × 5.80 m × 5.80 m, 390 mt).

SYNOPSIS

TGP managed global logistics for a hydrogen liquefaction site. Oversized equipment, skids and modules were consolidated and shipped from multiple origins to Rotterdam for temporary laydown and final site delivery.