Skip links

Steam Methane Reformer Hydrogen Project

Delivering critical components for a hydrogen facility in Saudi Arabia required meticulous planning and flawless execution. Trans Global Projects managed breakbulk shipments from South Korea and Thailand, ensuring seamless customs clearance, secure storage, and final delivery. All completed on time, within budget, and without a single incident.

FACTS & FIGURES

Timeframe
Executed in 2021, covering full transport and site delivery operations.

Route
From Masan, South Korea and Laem Chabang, Thailand to Dammam, Saudi Arabia, with final delivery to Jubail. Transport involved sea freight and on-carriage.

Client
A global leader in hydrogen solutions within the renewables sector.

Transport
Breakbulk sea freight, customs clearance, storage, and on-carriage to site.

The Cargo
Total of 6,500 cbm, including a 92 mt steam drum from South Korea and 6,270 cbm of cargo from Thailand. All cargo delivered without damage or incidents.

SYNOPSIS

TGP managed the logistics for a hydrogen production facility using SMR technology. The scope included breakbulk shipments, customs clearance, storage, and final delivery to site—completed on time, within budget, and without damage.

Download Case Study (PDF)

Download

More Case Studies

All case studies
This site is registered on portal.liquid-themes.com as a development site. Switch to production mode to remove this warning.