Skip links

Onshore Pipeline Project, Australia

Delivering coated pipes for a major Australian pipeline project required more than transport: it demanded precision. Trans Global Projects combined multimodal shipping with advanced handling and QA processes to ensure every pipe and bend arrived safely and met strict technical standards.

FACTS & FIGURES

Client
A major international steel pipe contractor

Location
Mundra, India to Kurri Kurri, NSW, Australia

Project Period
2023 – 2023

Total Cargo Weight / Volume
36,000 cbm

SCOPE OF WORK

Cargo consisted of DLFBE coated pipe 42″ OD, 14″OD and bends. Cargo was shipped from Mundra, India to Newcastle, Australia, stored and then delivered to Kurri Kurri in NSW, Australia.

TGP provided online data reporting, custody transfer, QA testing with holiday detection equipment, all machinery for cargo handling including vacuum technology fitted to excavators.

Download Case Study (PDF)

Download

More Case Studies

All case studies
This site is registered on portal.liquid-themes.com as a development site. Switch to production mode to remove this warning.