Power Transformers

Trans Global Projects managed the door-to-door transport of 47 power transformers from Brazil to the USA, overseeing engineering calculations, barge loadouts and full project coordination across multiple phases of ocean and inland transport.

FACTS & FIGURES

Timeframe
Executed between 2024 and 2025, with 11 units delivered in 2024 and 36 in 2025.

Route
From Brazil to the USA via ocean freight and barge transport, covering intercontinental distances.

Client
A leading company in the power industry, specialising in energy infrastructure.

Transport
Door-to-door logistics including barge loadouts and ocean freight.

The Cargo
47 transformers ranging from 58 mt to 206 mt, totalling 6,195 mt and 10,048 cbm; transported in multiple phases.

SYNOPSIS

TGP managed the door-to-door transport of 47 power transformers from Brazil to the USA, including engineering calculations, barge loadouts, and full project coordination.