Moving 7,000 cbm of heavy industrial cargo into the heart of Brazil’s mining region required more than transport: it demanded strategy. Trans Global Projects combined six vessel charters with river and road solutions to navigate remote terrain, ensuring critical equipment reached the Carajás site safely and on schedule.

FACTS & FIGURES

Client
A Brazilian Mining Company

Location
Shanghai, China to Acu, Brazil

Project Period
2023 – 2023

Total Cargo Weight / Volume
7,000 cbm

SCOPE OF WORK

One RORO door to door solution for a 115 t transformer from Brescia, Italy to Vitoria, Brazil. 6 x vessel charters from EXW Shanghai, China (including barge) and Korea to Acu, Brazil with a total of 7,000 cbm of break bulk cargo.

320 nautical miles by river barge and 600 km by road to the Carajás Mining District mine site in the jungles of northern Brazil. The largest pieces (rotary kiln sections) were 6.09 m wide and 6.19 m high.

Download Case Study (PDF)