Wind 3,500 MW Transmission

Trans Global Projects managed the transport and installation of HVDC components for a major wind energy project in the southwestern United States, coordinating converter transformers and general cargo from Europe to Arizona and New Mexico for a 3.5 GW transmission system.

FACTS & FIGURES

Timeframe
Executed between 2023 and 2025, covering transport and installation of HVDC components.

Route
Cargo was shipped from Norrköping, Sweden and various European regions (North, South, Central) to sites in Arizona and New Mexico, USA. The transmission line spans 890 km across the southwestern United States.

Client
A leading energy technology provider in the renewables sector, based in the United States.

Transport
Multimodal transport including sea freight and land haulage, with final installation on foundations.

The Cargo
14 converter transformers weighing between 270 and 282 mt each, plus general cargo totalling 39,000 cbm. All items were delivered in operational condition and installed on site.

SYNOPSIS

TGP delivered the HVDC system for a Wind project, a 3.5 GW wind farm in Arizona and New Mexico. The scope included transporting converter transformers and general cargo from Europe to the USA, followed by installation on site foundations.

Download Case Study (PDF)