Trans Global Projects successfully delivered 24 replacement wind turbine blades for a major renewable energy provider, navigating a complex route from Asia to South America and overcoming a six-month port storage delay caused by roadworks to ensure timely, safe completion.
FACTS & FIGURES
Timeframe
Executed in 2024, covering full transport and delivery of 24 replacement blades.
Route
From Shanghai, China and Tuticorin, India via Paracas Port, Peru and San Antonio Port, Chile to inland sites in Lima, Peru and Comunas de Las Condes, Chile.
Client
Global leader in the renewable energy sector.
Transport
Multimodal: EXW, ocean freight, port storage, and inland road transport.
The Cargo
24 wind turbine blades (72.19 m × 4.61 m × 3.75 m, 22 mt each), totalling approx. 29,951 cbm. Six-month port storage in Peru due to road renovations.
SYNOPSIS
TGP managed the replacement of 24 wind turbine blades for a leading renewable energy provider. The blades were transported from China and India via Peru and Chile to final inland sites, overcoming logistical challenges such as a six-month port storage due to roadworks. The project was delivered safely, on time and within budget.