Wharf Construction Project, Antarctica

Trans Global Projects successfully led project logistics management for a shipment to the British Antarctic Survey’s Rothera Research Station.

FACTS & FIGURES

Client Name
BAM, a global construction and civil engineering firm; and the British Antarctic Survey (BAS).

Location
US/UK/EU origins to King Edward Point, South Georgia and Rothera, Antarctica

Project Period
2018 – 2026

Total Cargo Weight / Volume
65,458 cbm

SCOPE OF WORK

TGP was awarded multiple contracts for handling several phases of the Rothera Wharf Modernisation Project & King Edward Point Wharf Project. The scope included transportation of project base cargo via ice-class and polar-coded vessels from US/UK/EU origins to South Georgia and Antarctica. In 2026, TGP demobilises 17,800 cbm of waste and equipment from Antarctica to the UK.

Strict compliance to stringent biosecurity requirements by TGP’s highly qualified team and providing comprehensive end-to-end logistics solutions to one of the most challenging construction sites in the world.

Download Case Study (PDF)

Download

More Case Studies

All case studies
This site is registered on portal.liquid-themes.com as a development site. Switch to production mode to remove this warning.