Skip links

Steel Mill Upgrade Project, Germany

Trans Global Projects managed the inland transport and site delivery of oversized components for a process gas heater to a steel mill in Lower Saxony, Germany, ensuring compliance with mill-specific regulations and using specialized trailers for final delivery.

FACTS & FIGURES

Client
A leading German steel producer

Location
Inland river port to Salzgitter, Germany

Project Period
2025 – 2025

Total Cargo Weight / Volume
Multiple material packages / 3,235 cbm / 399,348 KGs

SCOPE OF WORK

TGP managed the delivery of components for the process gas heater, including on-site delivery coordination to ensure the timely delivery of various material packages. This involved handling cargo with heights of up to 6.45 m.

Delivery was planned in compliance with special steel mill regulations, covering transport from the inland river port to the final destination and incorporating specialized trailer configurations.

Download Case Study (PDF)

Download

More Case Studies

All case studies
This site is registered on portal.liquid-themes.com as a development site. Switch to production mode to remove this warning.