Skip links

Offshore Oilfield Development Project, Brazil

Trans Global Projects managed the transatlantic shipment of over‑dimensional reels for an oil and gas project, coordinating the transport of five heavy reels from Newcastle, United Kingdom, to Rio de Janeiro, Brazil.

FACTS & FIGURES

Client
A leading Brazilian oil company

Location
Newcastle, United Kingdom to Rio de Janeiro, Brazil

Project Period
2024 – 2024

Total Cargo Weight / Volume
1182.10 mt + 29.7 mt of accessories

SCOPE OF WORK

The reels, each weighing between 190 – 260 mt, were shipped across the Atlantic from Newcastle to the Port of Açu, with TGP arranging all necessary logistics to ensure the safe loading and timely delivery of the cargo.

Five over-dimensional reels from Newcastle, UK, to Rio de Janeiro, Brazil.

Download Case Study (PDF)

Download

More Case Studies

All case studies
This site is registered on portal.liquid-themes.com as a development site. Switch to production mode to remove this warning.